Bid Bond vs Letter of Credit: What Project Owners Prefer

Published 2026-11-09 · By , Licensed Insurance Agent · 5 min read

TL;DRProject owners choose between bid bonds and letters of credit based on risk transfer, total cost, and schedule impact. Bonds shift risk to a surety and are issued quickly with minimal collateral, while letters of credit involve a bank, may require more security, and can be cheaper for well‑capitalized contractors. Understanding these differences helps owners select the guarantee that best protects their project.

A bid bond and a letter of credit both protect owners if a contractor backs out, but they do so in very different ways. Knowing how each works lets you evaluate risk, cost, and timing. Here’s a clear comparison to help you decide which guarantee an owner will likely prefer.

How a Bid Bond Works

A bid bond is a surety guarantee that protects the project owner if the winning contractor fails to sign the contract or provide required performance bonds.

The contractor purchases the bond through a surety company. The premium is usually 1‑3 % of the bid amount, but the owner never pays it directly. If the contractor defaults, the surety steps in, pays the owner up to the bond amount, and then seeks reimbursement from the contractor.

Underwriting focuses on the contractor’s credit history, financial statements, and past project performance. Most owners require a bond equal to 5‑10 % of the total bid, as specified in the solicitation.

Key points for owners:

How a Letter of Credit Works

A letter of credit (LOC) is a bank‑issued document that promises to pay the project owner up to a specified amount if the contractor defaults on the bid.

The contractor arranges the LOC with its bank, which may require collateral, a cash deposit, or a line of credit. The bank charges a fee—often 0.5‑2 % of the LOC amount—plus any interest on the underlying credit.

LOCs come in two main forms: revocable (easily cancelled by the bank) and irrevocable (cannot be cancelled without the owner’s consent). Most construction projects require an irrevocable LOC to ensure the guarantee is firm.

For owners, the LOC offers:

What Project Owners Care About

Project owners evaluate bid guarantees primarily on three criteria: risk exposure, total cost, and schedule impact.

Risk exposure is the top concern. Owners want assurance that they will be compensated quickly if the winning bid falls through. A surety bond transfers that risk to the surety, while an LOC places the risk with the bank, which may have stricter default procedures.

Cost includes the premium or fee, plus any administrative handling. Because the owner does not pay the bond premium, the contractor’s cost is indirect. An LOC fee is paid to the bank and may be passed through to the owner in the contract price.

Schedule matters when projects have tight start dates. Bonds can be issued rapidly once the contractor’s credit is vetted, whereas an LOC may require additional bank approvals and collateral verification, potentially adding days to the pre‑construction phase.

Other factors include the owner’s familiarity with the issuing institution, the contractor’s existing relationships, and the level of documentation the owner is willing to review.

Pros and Cons: Bid Bond vs Letter of Credit

Below is a side‑by‑side look at the most relevant factors for owners.

Need a quote?

Get a same-day surety bond quote from a licensed agency in all 50 states.

Get a Free Quote →